cs d&e consultancy pte ltdcs engineering & fire pte ltd

cs group

Fire safety consultancy & submission | fire protection installation

who are we?

Incorporated in 2011, we started out as cs draft as a small business, initially providing consultancy services solely for plan submissions in Singapore.

Over the years, the company has gradually grown and expanded our services to include fire protection system installation, becoming a one-stop service for our clients.

Today, our comprehensive range of services includes everything from fire safety installation to consultancy services for authority plan submissions – all available under one roof.

cs d&e consultancy pte ltdcs engineering & fire pte ltd

organisation chart

The Director is connected to three Engineers, the Project Director, the Finance Director and Finance Admin. The Project Director is also connected to the Finance Director and Installation Team.

what we do?

We offer a wide range of services; be it:

scdf //
fire safety submissions

In order to proceed with the proposed renovation works, a feasibility study will be conducted to determine the overall layout(s) compliances.

Site surveys will also be carried out to ensure compliance with SCDF’s latest code of practice & regulations.

Plans will be prepared in accordance to the latest code of practice & regulations for submission to SCDF to obtain BP (Architectural Plan) / FP (Fire Plan) / MV (Mechanical Ventilation) NOAs (Notice of Approval) / In-Principle Approval (MAA).

Registered Inspectors (RI) will be appointed to carry out inspections and ensure that the A&A works are in compliance.

Upon site completion, RIs will issue a Certificate of Inspection (Form 1) for the FSC (Fire Safety Cert) application to obtain the final approval (FSC), in order for businesses / outlets to commence their operations.

Meanwhile, for MAA (Minor additions and alterations), there will be no FSC issued out, therefore the “final approval” is a lodgement acceptance letter only (MAA Submission is subjected to scope of works involved / building management’s approval – unit’s existing FSC is required).

submission services
  1. BP Submission (architectural plan)
  2. FP Submission – sprinkler
  3. FP Submission – detector
  4. FP Submission – Kitchen suppression & Gas suppression / Server extinguishing system
  5. MV Submission - Ducting submission

fire safety engineering
installation

Adhering to the latest fire safety installation code of practice, fire safety installation is required to be done in order to obtain the FSC (Fire safety certificate) clearance once upon obtaining the FP (fire plan) NOA (notice of approval).

At cs, we offer a comprehensive range of fire safety design & installation services in Singapore, including fire alarm systems, fire sprinkler systems, and fire suppression systems. Our team will communicate & work with you to assess your unit’s / building’s fire safety needs and provide feasible & sound solutions that meet your specific design requirements & workaround with the existing building restrictions where applicable, in compliance with the latest fire safety code of practices.

our installation services

sprinkler & pipe joint(s) installations:

  • normal sprinkler
  • royal flush sprinkler
  • early suppression, fast response sprinkler
  • sprinkler plate & guard cover installation
CS Group drawing of sprinkler heads and pipe joints

fire alarm detector(s) installations (conventional system):

  • conventional fire alarm panel
  • smoke detectors
  • heat detectors
  • manual call points
  • fire alarm bell
  • strobe lights
CS Group drawing of a conventional fire alarm panel
CS Group drawing of a smoke detector
CS Group drawing of a heat detector
CS Group drawing of a manual call point
CS Group drawing of a fire alarm bell
CS Group drawing of a strobe light

fire hosereel installation:

  • installation of hosereel
  • water piping works to PUB main supply / building standalone hosereel supply
  • mounting of supporting brackets
  • hosereel cabinet(s)
CS Group drawing of a fire hose reel and supply pipework

kitchen suppression (wet chemical) installation:

  • piping / nozzle installation works
  • wet chemical kitchen suppression tank installation
CS Group drawing of a wet chemical kitchen suppression system

Gas suppression (server) system installation:

  • Gas suppression (server) system
  • fire alarm works (fire alarm panel / detectors)
  • breathing apparatus
  • specialized electronic warning signages (dedicated for Gas suppression (server) system)
CS Group drawing of a gas suppression (server) system and associated alarm equipment

TALK TO US!

Have any questions? We are always available to discuss your enquiries, whether you are seeking advice for new projects, business opportunities, or ways we can work together.

phone number:

office:

+65 6741 3051+65 6741 3052

mobile:

+65 9759 5688

office address:

1 Tampines North Drive 1
#03-13, T-Space
Singapore 528559

WORKING HOURS

Monday – Friday
09:00 am – 05:30 pm
Saturday & Sunday – Closed

get in touch

Opens your email app.
Send your enquiry from there.

Read our privacy statement for how we handle your personal data.

our office

1 Tampines North Drive 1 · #03-13, T-Space · Singapore 528559

Get directions

T-Space, Tampines

Loading the map connects to Google. Privacy details